Trade Terms

Shipping, payment, and lead time questions

Answers on export packaging, payment mechanisms, and shipping lead times for international buyers.

Which shipping terms do you accept?

We accommodate standard FOB, CIF, and CFR terms. Tell us your preferred Incoterm and we will confirm the arrangement in writing.

How is machinery packed for export?

Equipment is prepared for export packing suited to its size and transport route. Packing details are confirmed before dispatch.

What are typical shipping lead times?

Lead times depend on the machine configuration and destination. We provide a schedule with your quotation so you can plan accordingly.

Technical Protocol

Voltage, inspection, and spare parts

The steps below cover voltage adaptation, pre-acceptance inspection, and how to order wear parts after commissioning.

01 Voltage adaptation

Share your regional industrial voltage and frequency. We configure the electrical system to match before shipment.

02 Pre-acceptance inspection

Buyers can review the equipment against the agreed specification before acceptance, with documentation provided.

03 Spare part ordering

Wear parts can be supplied long-term. Send your machine model and part description, and we will confirm availability.